Why St. Lucie County is Very High risk

Score calculated from four factors: power infrastructure, water capacity, land availability, and current exposure. The Sentinel Grove withdrawal hasn't reset the score — the parcel is still owned by the same investor, there is no county moratorium to stop a refiling, and Atlas Compute is separately in early planning.

Power availability
27/30

Major in-county power generation (≥1,500 MW). Developers can site campuses near existing plants.

Water capacity
6/15

South Florida Water Management District — Everglades restoration, high demand, significant water stress.

Land availability
9/15

Suburban with citrus-grove conversions. Some large parcels available, but growing competition.

Current exposure
40/40

Sentinel Grove withdrawn, not denied — land still held by Epic Estates 68 LLC, no moratorium in place. Atlas Compute separately in early planning.

This score is comparative, based on publicly available data across Florida's 67 counties. Methodology: how we calculate it.
At a Glance

Two projects, very different scales.

2 projects
Sentinel Grove Site
1,218 acres · Fort Pierce
Sentinel Buildout
Up to 15 million sq ft
Sentinel Investment
$13.5 billion projected
Sentinel Status
Withdrawn Feb 26, 2026
Atlas Compute Site
Midway Industrial Park
Atlas Compute Size
240 MW, scaling to 1 GW
Project Files

The two St. Lucie proposals.

Sentinel Grove Technology Park (Project Jarvis)
Withdrawn · February 26, 2026

The Sentinel Grove Technology Park was designed for approximately 1,218 acres of former citrus groves on the east side of Minute Maid Road, about 2,600 feet north of Orange Avenue (State Road 68), south and east of the South Florida Water Management District's C-25 Canal. The land was purchased for $15 million in July 2024 by Epic Estates 68 LLC, a Tallahassee-based land-banking investment firm. Architect and planning firm HJA Design Studios submitted the application alongside real estate firm Timberline Real Estate Partners.

The scale of what was proposed is difficult to overstate. The applicant's notice described total buildout of 15 million square feet across multiple phases — with 5 million square feet in the first phase alone and an initial capital commitment of approximately $13.5 billion for the first 1,000 megawatts of data center capacity. The buildings would have been around 60 feet tall. The developers projected more than 6,000 high-wage specialized jobs at full buildout, though officials noted the jobs-per-square-foot ratio was lower than typical industrial use.

In late 2025, the St. Lucie County Planning and Zoning Commission voted 4–2 against recommending the comprehensive plan amendment needed to rezone the agricultural land for industrial use. County staff had recommended approval. Residents raised concerns about water consumption (the parcel is already allocated 2.2 million gallons per day), stormwater management, generator emissions, noise, and the transition of productive agricultural land to industrial use.

Commissioner Jamie Fowler called it "the hardest vote to date" and said commissioners planned to visit existing data centers in Virginia, North Carolina, and Georgia before making a final decision. That decision never came. On February 26, 2026, the developers voluntarily withdrew the land-use application. St. Lucie County officials said the withdrawal was a response to advancing state legislation — specifically SB 484, SB 1118, HB 1007, and HB 1517, which collectively would create Florida's first statewide framework for regulating hyperscale data centers. The parcel remains zoned agricultural. Epic Estates 68 LLC still owns the land.

Atlas Compute AI Data Center Campus
Zoning verified · No application filed

A much smaller, separately-sponsored project sits in early planning within St. Lucie County — and it follows the same ownership pattern as every other Florida proposal on this site. Atlas Compute, a Miami-based company, announced in November 2025 that it had “secured land and utilities” for the campus. It does not appear on the deed. County records show the four target parcels on Post Office Road inside the Midway Industrial Park are owned by Fort Pierce No. 2 LLC and Fort Pierce No. 3 LLC — two entities registered to the same Miami address. St. Lucie County staff issued a zoning verification letter in December 2025, addressed to a person seeking zoning confirmation for those parcels. The planned facility is designed for an initial capacity of 240 MW with expansion potential up to 1 GW, intended for large-scale AI, cloud, and machine learning workloads.

The design emphasizes closed-loop, water-free cooling — a significant differentiator from projects that rely on evaporative cooling towers. Atlas Compute is partnering with Penguin Solutions for a facility specifically engineered around NVIDIA GPU-based compute. Atlas Compute’s own November 2025 release targeted operational readiness between Q4 2026 and Q1 2027 — a timeline that would require construction to be well underway by now. As of March 12, 2026, St. Lucie County confirmed to WPTV and WFLX that no application of any kind had been submitted. Atlas Compute did not respond to either outlet. Given the early stage and the industrial-park siting, Atlas Compute has not drawn the same community opposition as Sentinel Grove.

Timeline

How Sentinel Grove came and went.

July 2024
Land acquired. Epic Estates 68 LLC buys the 1,218-acre former citrus grove for $15 million.
November 2025
Sentinel Grove proposal surfaces publicly. Port St. Lucie-area outlets report on the 15-million-sq-ft, $13.5B project.
November 6, 2025
Atlas Compute announces a 240 MW campus. A press release says the Miami company has “secured land and utilities” in Central Florida for a liquid-cooled, NVIDIA-optimized campus built with Penguin Solutions, scaling to 1 GW at 100 kW per rack. It targets operational readiness between Q4 2026 and Q1 2027. The release does not name Fort Pierce.
Late 2025
Planning and Zoning Commission votes 4–2 against. The board recommends the Board of County Commissioners not approve the comprehensive plan amendment. Sentinel Grove's path narrows.
December 2025
Zoning verification issued. St. Lucie County staff issue a zoning verification letter for four parcels on Post Office Road in the Midway Industrial Park, addressed to a person seeking zoning confirmation for a proposed data center. The parcels are owned by Fort Pierce No. 2 LLC and Fort Pierce No. 3 LLC — both at the same Miami address, neither named Atlas Compute.
December 10, 2025
County Commission delays final vote. Commissioners request additional impact studies. Commissioners Fowler and Townsend announce plans to visit data centers in Virginia, North Carolina, and Georgia.
February 2026
Florida Legislature advances SB 484, HB 1007, SB 1118, HB 1517. The bills introduce the first statewide framework for hyperscale data centers — and create real uncertainty for developers whose projects are mid-permitting.
February 26, 2026
Sentinel Grove withdrawn. Developers voluntarily pull the land-use application. County records show the project status as "Canceled." Epic Estates retains the land. The developers say they are monitoring the legislation before deciding whether to refile.
March 12, 2026
County: no application submitted. WPTV and WFLX ask St. Lucie County about the Atlas Compute campus. County leaders confirm no application proposals have been submitted for the project. Atlas Compute does not respond to either outlet. Neighbor Juli Iles tells WPTV she wants to know “how big it’s going to be, where it’s going to be, how that may affect my home, and my access to utilities.” Four months past that, the county still has nothing on file.
What It Means

For St. Lucie County residents.

The 1,218-acre Sentinel Grove parcel is still owned by Epic Estates 68 LLC. A withdrawal is not a cancellation. If state legislation clarifies what's allowed — particularly around water use, ratepayer cost protection, and local authority — the developers could refile a modified application. Residents concerned about the future of that parcel should monitor public hearings and filings at the St. Lucie County Planning and Zoning Commission.

Atlas Compute's campus is the quieter risk. The industrial-park siting and water-free cooling design blunt the impacts that mobilized people against Sentinel Grove, which is likely why it has drawn no organized opposition. But note what it has and hasn't done: a national press release claiming secured land and utilities, a zoning verification letter, and shell-LLC ownership on the parcels — and, eight months after announcing, still no application on file with the county. A project that hasn't applied also hasn't triggered a single public hearing. There is nothing to show up to. That is not the same as nothing happening.

Sentinel Grove's withdrawal — not denial — is the pattern worth watching statewide, and 2026 has now run it twice. St. Lucie's developers pulled back in February to wait out the legislation; Citrus County's Deltona Corporation withdrew in June rather than face a vote. The difference: Citrus had already passed a moratorium, so Deltona's refiling is frozen. St. Lucie has no moratorium. Epic Estates 68 LLC still owns all 1,218 acres, and nothing stops a refiling tomorrow.
Sources

Reporting we relied on.

  • TCPalm — primary local reporting on Sentinel Grove hearings
  • WPTV — St. Lucie County Commission coverage and commissioner statements
  • Data Center Dynamics (DCD) — industry-side reporting on the 4–2 P&Z vote
  • Port St. Lucie Talks — local outlet tracking the February 2026 withdrawal
  • Baxtel / Data Center Map — project details and site geography
  • St. Lucie County Property Appraiser's Office — land ownership and purchase records
What you can do

Sentinel Grove was withdrawn. The land hasn't moved.

We research your commissioners, write a personalized opposition letter citing state statutes and project data, and email it to every commissioner on your behalf. 60 seconds.

Get Your St. Lucie Take Action

60 seconds · Letter sent within 24 hours

Join the community

Stop Data Centers

Connect with residents across the country who are fighting data center development in their communities. Share updates, strategies, and stay informed.

Join the Stop Data Centers group

Public group · Free to join