Tracking every proposed hyperscale data center in Florida's 67 counties.
Risk Profile

Manatee County

Tampa Bay · Pop. 410,000 · Bradenton

Manatee County has strong structural characteristics that attract data center developers.

Data Center Risk
67/100
High

Why this score?

Four weighted factors drive the Manatee County risk score. Methodology is fully documented — each input is public data or a reasoned proxy.

Power availability
30/30

Major in-county power generation (≥1,500 MW). Developers can site hyperscale campuses next to existing plants.

Water capacity
10/15

Southwest Florida WMD — growing population, rising water stress.

Land availability
9/15

Suburban. Some large parcels available, but growing competition.

Current exposure
18/40

One adjacent county has an active project. Regional infrastructure is already being tapped.

Water infrastructure

Any hyperscale data center in Manatee County would need a consumptive use permit from the Southwest Florida Water Management District.

The Southwest Florida Water Management District (SWFWMD) is the district that handled the Fort Meade hyperscale permit review. SWFWMD quietly adopted a new rule that required Stonebridge's Fort Meade project to clear a separate water permit at a public governing board meeting — a precedent that will apply to other data center proposals in this district. SWFWMD covers Florida's most industrial central-west region.

A single hyperscale data center using evaporative cooling can require 1–5 million gallons per day. Because SWFWMD set a direct precedent on the Fort Meade project — requiring a separate public-board water permit for a hyperscale data center — any future proposal in this district will face the same scrutiny. That makes SWFWMD counties procedurally harder to site in, not easier.

Electric infrastructure

Grid capacity and transmission access are the single biggest driver of where hyperscale developers actually site projects.

Manatee County is served by Florida Power & Light as the primary electric utility, with Peace River Electric Cooperative covering rural and cooperative-served areas.

FPL is Florida's largest investor-owned utility with the deepest transmission infrastructure for large industrial loads. Adequate power availability is rarely the bottleneck in FPL territory — permitting, siting, and community opposition usually are.

Adjacent county activity

Data center campuses tend to cluster near existing infrastructure, meaning proposals in adjacent counties can quickly change the risk picture for Manatee County.

State legislative context

Florida's 2026 legislative session produced the regulatory framework that will shape every data center proposal in the state, including any that may come to Manatee County.

Florida's 2026 legislative session produced multiple bills that directly affect how data centers can be sited and permitted statewide, including in Manatee County. Only SB 484 became law — Chapter 2026-65, effective July 1, 2026. HB 1007 was laid on the table on March 11 and folded into it. Early versions of both proposed statewide siting restrictions, mandatory impact studies, and minimum setbacks from homes and schools. The enacted law contains none of those. What it does: requires the Public Service Commission to set tariffs ensuring large load customers pay their own cost of service rather than shifting it onto residential ratepayers (utilities must file by October 1, 2026), creates distinct consumptive use permit requirements for large-scale data centers, and eliminates the additional 12-month extension on the public-records exemption for data center projects. It does not ban data centers. The new s. 163.326 states that siting, infrastructure capacity, and land use compatibility "shall be addressed through local comprehensive planning and land development regulations" — the Legislature explicitly left this decision to your county commission. Under existing law (s. 288.075), economic development agencies can already shield project details for 12 months on written request — the mechanism behind code names like Project Tango in Palm Beach County. SB 484 narrows it: it defines “data center,” requires the agency to disclose business activities related to a data center’s location or expansion, and eliminates the additional 12-month extension for data center projects. Twelve months of secrecy, not twenty-four — but twelve months is still long enough for a project to arrive nearly finished.

What you can do

No active data center in Manatee County — yet.

Palm Beach got four days notice before their first zoning vote. Polk County approved Fort Meade's 4.4M-sq-ft complex on April 15. What they did, you can do — but only if you're ready before the proposal lands.

Enter your address and pick your concerns. We write a personalized opposition letter citing state statutes, local project data, and your specific concerns — then email it directly to every commissioner in your county on your behalf. You get a full copy of everything sent.

1,143 letters sent so far. Works in any state. 60 seconds.

Get Your Manatee County Take Action

Not legal advice. Each letter cites Florida public records, the Sunshine Law, SB 484, and documented data center cases from Newton County GA, Mansfield GA, and Bessemer AL.

Compare with other counties

See how Manatee County's score compares to the rest of Florida.

See all 67 counties ranked
Protect Your Property
We send an opposition letter to your commissioners for you.

We send an opposition letter to your commissioners for you. 60 seconds.

Take Action Now →
Join the community

Stop Data Centers

Connect with residents across the country who are fighting data center development in their communities. Share updates, strategies, and stay informed.

Join the Stop Data Centers group

Public group · Free to join