Home/United States/Georgia/Douglas County/Switch Keep Campus (Douglasville)
Switch project
Switch Keep Campus (Douglasville) data center, Lithia Springs, Georgia
1 Switch Way, Lithia Springs, GA 30122
Switch·Operating·150 MW
The siteImagery: Esri, Maxar
This data center in Lithia Springs, Douglas County is run by Switch. Sources put it at 150 MW.
150 MWreported power
Operatingstatus
The facts on file
- Company
- Switch
- Address
- 1 Switch Way, Lithia Springs, GA 30122
- County
- Douglas County, Georgia
- Country
- United States
- Status
- Operating
- Power
- 150 MW
- On that figure
- campus total at full build
- Operating or planned
- 2017
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- Google Douglas Countyunder 1 km
- Digital Realty Austell (101 Aquila Way)1 kmlisted on the Douglas County page
- Digital Realty ATL11 (Douglasville)1 kmlisted on the Douglas County page
- STACK Atlanta (Lithia Springs)1 km
- T5 Atlanta Campus (Lithia Springs)2 kmlisted on the Douglas County page
- DataBank Lithia Springs Campus (Atlanta 95 acres)2 km
- Stream Atlanta West (ATLA Douglasville)3 km
- DataBank ATL4 (200 Selig Dr)4 km
More from Switch
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to james@floridadatacenters.org and it gets fixed.