The siteImagery: Esri, Maxar
This data center in VIC, Victoria is run by STACK Infrastructure. Sources put it at 180 MW.
180 MWreported power
Operatingstatus
The facts on file
- Company
- STACK Infrastructure
- Address
- 399 Palmers Rd, Truganina, VIC, Australia
- Region
- Victoria
- Country
- Australia
- Status
- Operating
- Power
- 180 MW
- On that figure
- planned campus total per STACK; DCD says the operating part is two 36 MW buildings (72 MW)
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- AirTrunk MEL1 (Melbourne West)3 km
- CDC Laverton North3 km
- Digital Realty Melbourne (MEL10/MEL11 72 Radnor)5 km
- Southgate Melbourne9 km
- CDC Brooklyn9 km
- NEXTDC M3 Melbourne10 km
- NEXTDC M4 Melbourne14 kmlisted on the Victoria page
- Equinix Melbourne Deer Park Campus (ME1/ME2)15 kmlisted on the VIC page
More from STACK Infrastructure
- STACK Canberra (CAN01)Australian Capital Territory
- STACK StaffordVirginia, United States
- STACK Infrastructure NVA02Virginia, United States
- STACK Berry Hill (Danville)Virginia, United States
- STACK Phoenix (Avondale)Arizona, United States
- STACK Johor (JHB01)Johor, Malaysia
- All 37 STACK Infrastructure sites
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to james@floridadatacenters.org and it gets fixed.