Home/Spain/Community of Madrid/Data4 Madrid Campus (Alcobendas)
Data4 (Brookfield) project
Data4 Madrid Campus (Alcobendas) data center, Community of Madrid, Spain
Avenida de la Industria 15, 28108 Alcobendas, Spain
Data4 (Brookfield)·Operating·50 MW
The siteImagery: Esri, Maxar
This data center in Community of Madrid is run by Data4 (Brookfield). Sources put it at 50 MW.
50 MWreported power
Operatingstatus
The facts on file
- Company
- Data4 (Brookfield)
- Address
- Avenida de la Industria 15, 28108 Alcobendas, Spain
- Region
- Community of Madrid
- Country
- Spain
- Status
- Operating
- Power
- 50 MW
- On that figure
- MAD01 power figure on Data4 campus table (power reserve, not stated as IT load)
- Record checked
- Sep 29, 2026
Sources
Everything above comes from these. Open one and check it yourself.
Other projects nearby
Sites we track within 40 km.
- CyrusOne Madrid MAD1under 1 km
- Prime Madrid (Alcobendas)1 km
- Equinix xScale Madrid (MD3x/MD4x)1 km
- Google Madrid11 km
- Digital Realty Madrid (MAD1/2/3)11 km
- DayOne Spain (Barcelona / Zaragoza)12 kmlisted on the Community of Madrid page
- Iron Mountain Madrid (MAD-1)15 kmlisted on the Madrid page
- NTT Madrid 1 (Las Rozas)21 kmlisted on the Community of Madrid page
More from Data4 (Brookfield)
- Data4 Warsaw Campus (Jawczyce)Masovian Voivodeship, Poland
- All 7 Data4 (Brookfield) sites
Share this
Every project above is drawn from public records, filings and local reporting. Each row links to what it is based on. Statuses change, so check the source date before you rely on one. Found something wrong? Write to james@floridadatacenters.org and it gets fixed.